Elit Grand Palas
Istanbul · 2024
560 domestic hot water meters replaced; riser-by-riser works completed in about 25 days without cutting water to the whole site.
Figures below are as delivered — not rounded up.
Istanbul · 2024
560 domestic hot water meters replaced; riser-by-riser works completed in about 25 days without cutting water to the whole site.
Istanbul · 2024
Hybrid heat meters installed at roughly 130 points, DN20 to DN150, in about 3 months without changing mall or store operating hours.
Istanbul · 2026
Corroded galvanised pipework replaced while the site stayed occupied; the longest water interruption was 2 hours.
Kocaeli · 2025
Heat exchanger capacities recalculated and increased; heat meters migrated to wireless M-Bus communication.
Istanbul · 2025
Boiler-based hot water replaced with flat-level heat interface units; cold water risers rebuilt in PPR.