Skip to content
Novus Energy Systems — Mekanik Tesisat ve Enerji Çözümleri
Türkçe Platform Login Request a Quote
Company

Novus Energy Systems

We started working in remote meter reading and heat cost allocation in 2015 and were incorporated in 2018 in Çekmeköy, Istanbul as NOVUS ENERJİ SİSTEMLERİ TİCARET LİMİTED ŞİRKETİ. We work across mechanical systems, energy metering and building automation — supply, engineering and installation.

186

T.C. Çevre, Şehircilik ve İklim Değişikliği Bakanlığı tarafından yetkilendirilmiş 186 numaralı ölçüm şirketi. Gider paylaşım belgeleri bu yetkiyle düzenlenir. Bakanlık listesinden doğrulayın →

Regulatory framework in Türkiye

InstrumentWhat it requires
Law no. 5627 on Energy EfficiencyLegal basis for measuring and allocating consumption in centrally heated buildings.
Regulation, Official Gazette no. 26847 (14.04.2008)Sets out how heating and domestic hot water costs are allocated to individual units.
Law no. 3516 on MetrologyRequires periodic verification and stamping of meters — the basis of the five-year inspection cycle.
TS EN 1434Product standard for heat meters.

Brands we supply

  • Minol
  • Zenner
  • Qundis
  • Danfoss
  • Honeywell
  • Polimeter
  • Calmet
  • CEM

Quality

ISO 9001:2015 quality management system.

What we do

  • Remote meter reading — wired M-Bus, wireless M-Bus and LoRaWAN; 25 meter brands read regularly, manufacturer-independent.
  • Heat cost allocation — heating, domestic hot water, cold water, cooling and electricity allocated to individual units and documented.
  • Verification and calibration — five-year periodic inspection of heat meters under Law no. 3516, complaint inspections, calibration and battery replacement.
  • Mechanical systems — pipework modernisation, central heating refurbishment, heat substations, fire systems.

Authorisation

Novus Enerji is measurement company no. 186, authorised by the Republic of Türkiye Ministry of Environment, Urbanisation and Climate Change. Cost allocation documents are issued under this authorisation.

Track record

Selected figures: 560 domestic hot water meters replaced at Elit Grand Palas in about 25 days; roughly 130 measurement points from DN20 to DN150 installed at Starcity Shopping Mall in about 3 months; corroded pipework replaced at Pırlanta Göztepe while the site stayed occupied, with the longest water interruption lasting 2 hours.